安徽主保佳新型涂料有限公司,咨询电话:0551-66396238
公司新闻

真石漆企进行创新所需的成本有以下几个方面

日期:2016年7月23日 浏览[866]

创新必须“有所为有所不为”企业的稳定发展期不轻易大规模创新。企业由发展期进入了相对稳定期,这个时候也不能轻易创新。


Innovation must be "somewhat for the" enterprise's stable development is not easy large-scale innovation. Enterprises from the development period has entered a relatively stable period, this time can not easily be innovative.


建立一个管理体系,形成一套管理思路,是企业依靠长期的经验积累而成的。这个阶段不是创新的问题,而是改良的问题。通过改良,对企业运行的程序、秩序、体系进行"拾疑补缺"的完善。如果这个阶段实施大规模的创新举措,就会破坏企业的组织系统,从而大大影响企业的正常运行,从而影响企业的整体效益发挥。这个阶段,企业应该分清例行工作和例外工作,对于例行工作,要采取模板化管理,不可轻易变动,这是降低管理成本的重要因素;对于例外事项,要逐步理出头绪,通过吸纳、借鉴同行的方式,结合自身的特点,找出适合自己的办法,而这样的创新,是对原有程序、秩序、体系的补充完善。


Establish a management system, the formation of a set of management ideas, enterprises rely on long-term accumulation of experience. This stage is not the problem of innovation, but the problem of improvement. Through the improvement, the enterprise operating procedures, order, system of perfect pick up by suspected ". If this stage of the implementation of large-scale innovation initiatives, it will undermine the organizational system, thus greatly affect the normal operation of the enterprise, thus affecting the overall efficiency of the enterprise play. This stage, the enterprise should distinguish between routine and exceptional work, for routine work, to adopt a template management, not easily change, this is is an important factor to reduce the management cost; for exceptions to gradually sorted out, by absorbing and learn from peers, combined with its own characteristics, to find a suitable for their own way, and this innovation is the original program, order, system of perfect.


间接成本。创新不仅有直接成本,还有间接成本,往往间接成本要比直接成本大得多,因为间接成本无法直接评估,并容易被决策者忽视。间接成本体现在哪里?体现在具体实施创新的过程中,对原来程序、秩序、体系打破的过程中,而新的程序、秩序、体系还没有建立起来的情况下,对企业生产系统、经营系统以及管理系统带来的冲击,以及给整体经营绩效带来影响。


Indirect cost. Innovation not only has direct costs, as there are indirect costs, often indirect costs much greater than the direct cost, because indirect costs can not be directly assessed, and easy to be ignored by policy makers. Where is the indirect cost? Reflected in the process of specific implementation of innovation to the original program, order, to break the system in the process, and under the new program, the order, the system has not established the, impact on enterprise production system, management system and management system, and to the overall business performance impact.


人力成本,要推行新的举措,企业要搞创新,就必须投入人力,组织一班人马,从方案的制定入手,到广泛征求意见,到修改完善,再到层层动员,最后到具体实施、检查评估。这是一个封闭的体系,需要真石漆企业上下左右同心协力才能做好,否则难以取得效果。


Manpower cost, and to implement new initiatives, business to engage in innovation, it is necessary to input of manpower, organization of class of troops, starting from the plan, to solicit opinions, to revise and improve, to layers of mobilization, and finally to specific implementation, inspection and evaluation. This is a closed system, need to work together to enterprises around the stone well, otherwise it is difficult to achieve results.


资金成本。有些创新是需要投入大量资金的,譬如产品、工艺技术的创新,这些项目实施周期都比较长,回报期也相应较长,就要求企业必须具备较强的实力,否则将无法完成创新项目,实现创新的目标。


Cost of capital. Some innovation is the need to invest a lot of money, such as the innovation of the products, technology and the project implementation cycle is long, return period is correspondingly longer requires the company must have a strong strength, otherwise will not be able to complete project innovation, innovation to achieve the goal.

 

 

安徽真石漆官方网站:http://www.ahzbj.com

最新内容:



上一篇: 如何选购优良的油漆产品 看专业人士为您支招
下一篇: 主保佳新型材料浅谈水性多彩涂料的特点

安徽新型涂料有限公司 合肥墙绘公司 合肥网络布线版权所有 Copyright  2010 All Right Reserve 免责声明 皖ICP备11002092号 合肥网站制作:合肥网络公司

安徽省合肥市双凤工业园 网址:http://www.ahzbj.com/  网站地图