天然真石漆的一般施工工艺辊涂底涂和遮盖保护及打分格条

日期:2016年7月14日 浏览[918]

遮盖保护及打分格条


Cover protection and scoring grid


喷涂真石漆前应先用塑料膜将门、窗等不需喷涂的部位保护好,如需图案效果,可先用铅笔在其面上描出图案,再用分格纸沿图案贴好。


Spraying truestonepaint should be preceded with a plastic door and window and no need for spraying the site protection is good, needs to design effect, can use a pencil to trace a design in the surface, and then points grid paper pattern along the stick.


辊涂底涂


Roller coating


底涂主要成分为苯乙烯—丙烯酸酯共聚物,能有效保护中涂及面涂免受墙体内部化学物质的侵蚀。选用底漆时颜色应与中涂层及面涂层颜色一致,这样可以更加突出仿石特点。施工时应用滚刷和毛刷上底涂二遍,或用无气喷枪均匀薄喷二遍。注册食品公司第二遍底涂应在第一遍完全干燥后喷涂,通常情况气温在25 摄氏度时间隔2 小时即可。


The main component of the primer is styrene acrylic acid copolymer, which can effectively protect the middle and surface coating from the internal chemical corrosion of the wall. When choosing a primer, color should be consistent with the color of the coating and surface coating, which can be more prominent feature of the imitation stone. The construction application of the rolling brush and the bottom brush coated two times, or by airless spray gun uniform thin spray two times. Second times the end of coating should be in the first time after completely dry spray, usually the temperature in 25 degrees Celsius time every 2 hours can be.

 

安徽真石漆官方网站:http://www.ahzbj.com/

 

最新内容:



上一篇: 真石漆涂料施工前应对基层表面进行以下几个方面验收
下一篇: 真石漆的施工工艺之喷涂真石漆和辊涂罩面漆

安徽新型涂料有限公司 合肥墙绘公司 合肥网络布线版权所有 Copyright  2010 All Right Reserve 免责声明 皖ICP备11002092号 合肥网站制作:合肥网络公司

安徽省合肥市双凤工业园 网址:http://www.ahzbj.com/  网站地图